Copper Network Decommission Method has been proven in over 10 different environments yielding millions of feet of copper cable with highly profitable results for the operators.
Copper Network Decommission Method has been proven in over 10 different environments yielding millions of feet of copper cable with highly profitable results for the operators.
-Cable log audit abandoned and cable underutilized -Physical audit for determine the frame and deployment scheme
-Recommendation of cables to be removed for approval by Telco -Development and consolidation of work circuits to maximize the extraction volume that include migration / consolidation of circuits according to ROI
-Use of equipment, personnel and specialized methodology for remove and cut the cable. -Monitoring and control of the process through a system designed to measure (in the cloud).
-Sale with collection immediate. -Results preparation financial net profit monthly -Automated system for track every meter cable (audit and control).